Power Plant Protection Track
Earn up to 3.0 CEUs or 30 PDHs
The Power Plant Protection Track is suited for individuals engaged in safeguarding power plant assets across utility, cogeneration, and heavy industrial settings, or those seeking an in-depth understanding of the topic.

Sunday, July 26, 2026
5:00 PM - 7:00 PM
Seminar Check-in
- Please check-in for the seminar and pick-up your badge sometime between 5:00-7:00 PM on Sunday, July 26th.
- If you can't make it on Sunday, please stop by the Help Desk sometime between 7:00-8:00 AM on Monday, July 27th.
Monday, July 27, 2026
7:00 AM - 8:00 AM
Breakfast & Attendee Check-in
Please check-in for the seminar and pick-up your badge at the Beckwith Electric Help Desk.
8:00 AM - 8:30 AM
Welcome & Introductions
8:30 AM - 9:45 AM
Generator Protection – IEEE C37.102
Generators are subject to internal faults, external faults and abnormal operating conditions impressed by turbine and excitation system issues, as well as power system events the generator has no control over but must cope with. False (nuisance) trips are costly as the generator’s output is lost. Inability to trip due to lack of sensitivity, lack of certain protections or deficiencies in protection application may cause severe damage to generators, resulting in prolonged outage and revenue loss, plus increased system stability risk. Achieving the ideal balance of secure and dependable protection involves use of an array of elements that protect the generator for all operating modes: off-line, start up, synchronizing, various levels of power output and when challenged by system faults and anomalies.
- Generator construction and operation
- Grounding and connections
- IEEE standards for generator protection
- IEEE C37.102 (Guide for AC Generator Protection)
- Generator and power system interaction
- Generator protection element overview
- Internal faults (in the generator zone)
- Abnormal operating conditions
- External faults
- Protection Application Exploration
- Stator Ground Fault (27TN, 59N, 59D, 64S, 67N, 87GD)
- Exploration of stator ground fault injection protection sensitivity and security
- Rotor Ground Fault/Brush Lift Off (64F, 64B)
- Stator Phase Fault (87G)
- Turn-to-Turn Fault
- Phase Unbalance/Open Conductor (46)
- Overexcitation (24)
- Abnormal Voltage (59)
- Phase Fault Backup (21)
- Field Loss (40)
- Loss of Synchronism (78)
- Abnormal Frequency (81-U, 81A)
- Inadvertent Energizing (50/27)
- Blown VT Fuses (60FL)
- Breaker Failure/Pole Flashover (50BF)
- Loss of Prime Mover (32)
- Tripping considerations and sequential tripping
- Discuss tactics to improve reliability (security & dependability)
- Generator protection upgrade considerations & Redundancy concepts
- Explore Setting, Commissioning and Event Investigation Tools
9:45 AM - 10:00 AM
Break
10:00 AM - Noon
Generator Protection – IEEE C37.102 (Continued)
Noon - 1:00 PM
Lunch
1:00 PM - 2:45 PM
Generator Protection – IEEE C37.102 (Continued)
2:45 PM - 3:00 PM
Break
3:00 PM - 5:00 PM
Fault Fundamentals
Tuesday, July 28, 2026
7:00 AM - 8:00 AM
Breakfast
8:00 AM - 9:45 AM
Generator Protection Calculations & Settings
- Building on the base knowledge covered in Generator Protection Fundamentals, calculations for protective elements are developed.
- Depending on the element, these calculations use nameplate data, system data or a combination of the two.
- Margin considerations are explored and impacts on element reliability are discussed, as well as element interdependencies with protection and control in the generator zone, local power plant and system.
9:45 AM - 10:00 AM
Break
10:00 AM - Noon
Generator Protection Calculations & Settings (Continued)
Noon - 1:00 PM
Lunch
1:00 PM - 2:45 PM
Generator Protection Calculations & Settings (Continued)
2:45 PM - 3:00 PM
Break
3:00 PM - 5:00 PM
Generator Protection Calculations & Settings (Continued)
Wednesday, July 29, 2026
7:00 AM - 8:00 AM
Breakfast
8:00 AM - 9:45 AM
Transformer Protection – IEEE C37.91
Transformers are subject to internal faults, the effects of external faults and abnormal operating conditions impressed by the power system events the transformer has no control over but must cope with. False (nuisance) trips are costly as the transformer and load are disconnected. Inability to trip due to lack of sensitivity, lack of certain protections or deficiencies in protection application may cause severe damage to transformers, negatively impacting power flows, impacting power quality and compromising stability. Achieving the ideal balance of secure and dependable protection involves use of an array of elements that protect the transformer from prolonged internal faults, excessive through faults and when challenged by power system faults and anomalies.
- IEEE C37.91 (Guide for Protecting Power Transformers)
- IEEE Devices used in Transformer Protection
- Transformer Protection Review & Functions
- Explore Protection Functions
- 87T Phase Differential Characteristic
- Compensation in Digital Relays
- Relay Configuration: Winding Arrangement and CT Connection
- Overcurrent based (50, 51, 50N, 51N, 46)
- Through fault protection (TFM)
- Overexcitation (24)
- Generating plant causes
- T&D system causes
- Protection Against Overexcitation – V/Hz versus 5th Harmonic
- Phase Differential (87T)
- Unique Issues Applying to Transformer Differential Protection
- CT performance issues (saturation, remnant flux, tolerance, rating)
- Percentage differential characteristics with variable percentage slopes
- Internal ground fault sensitivity
- Restraints for inrush and overexcitation
- Overexcitation 87T Blocking Restraint – Failure to detect nascent fault
- Overexcitation Adaptive 87T Pickup Restraint – Detects nascent faults
- Adaptive restraint for security
- Point-on-Wave Switching Inrush
- Cross Phase Averaging
- Switch-onto-Fault
- High Set Phase Differential (87H)
- Ground Differential (87GD), Restricted Earth Fault (REF)
- Interface and Analysis Software: Desirable Attributes
- NERC “State of Reliability”
9:45 AM - 10:00 AM
Break
10:00 AM - Noon
Transformer Protection – IEEE C37.91 (Continued)
Noon - 1:00 PM
Lunch
1:00 PM - 2:45 PM
Advanced Transformer Protection – IEEE C37.91
2:45 PM - 3:00 PM
Break
3:00 PM - 5:30 PM
Transformer Protection Calculations & Settings
Building on the base knowledge covered in Transformer Protection Fundamentals, calculations for protective elements are developed. Depending on the element, these calculations use nameplate data, system data or a combination of the two. Margin considerations are explored and impacts on element reliability are discussed, as well as element interdependencies with protection and control in the transformer zone, whether in generation, transmission or distribution.
Thursday, July 30, 2026
7:00 AM - 8:00 AM
Breakfast
8:00 AM - 9:45 AM
Motor Bus Transfer
Motor Bus Transfer is the process of rapidly transferring sources to a motor bus for planned source switching and unplanned source failure. The rapid transfer allows the process to continue without interruption. To avoid damage to the motors, specialized equipment and methods are employed to cope with the dynamics of motor deceleration, and voltage and phase angle change between the new source and the motor bus. Improper reconnection of the motor bus can cause cumulative or immediate damage to the motors, and result in a process crash.
- Why Transfer Motor Load Sources
- Basic Application Configurations
- Primary-Backup
- Main-Tie-Main
- Multiple-Option Source Selection
- IEEE Std C37.96-2012 Motor Bus Transfer Classification – Methods & Modes
- Automatic and Manual
- Closed Transition Method – Hot Parallel Transfer
- Open Transition Method – Fast, In-Phase, Residual Voltage
- Open Transition Modes – Simultaneous, Sequential
- IEEE Std C37.96-2012 Conditions Across Normally Open Startup or Bus Tie Breaker – Before / During Transfer
- Effects of a Fault
- Out-of-Step (OOS) Generator Trip
- System Separation between Incoming Supply Sources
- Supply Source Transformer Winding Phase Shift
- Transient Effects upon Disconnect of Motor Loads
- Motor and Load Characteristic Effects on MBT
- Transfer Initiate, Inadvertent External Operation, Lockouts
- Load Shed During Transfer
- ANSI/NEMA Standard C50.41-2012
- Bus Transfer Spin Down Testing, Acceptance Testing, Setting Considerations
9:45 AM - 10:00 AM
Break
10:00 AM - 11:00 AM
Power Quality (PQ) Metering
Maintaining high power quality is essential to energy efficiency and energy cost management, as well as customer satisfaction. Low power quality can damage equipment, cause data loss or corruption, and result in costly power outages. International standards such as IEC 61000-4-30 establish power quality parameters that must be adhered to and processes for measuring the parameters. Meters that are certified to the IEC 61000-4-30 standard have demonstrated their ability to accurately measure the standard’s power quality parameters. Power quality meters must also provide alarm/limit capabilities and waveform recording for after event analysis. EN 50160 reporting is an important feature for meters sold in the European market. It gives the main characteristics of the grid voltage at the customer’s supply terminal under normal operating conditions.
11:00 AM - Noon
Event Analysis Case Studies
Noon - 1:00 PM
Lunch
1:00 PM - 2:30 PM
Event Analysis Case Studies (Continued)