Background and Mission
US ports are advancing electrification across vessel shore power, cargo-handling equipment (CHE), drayage trucks, harbor craft and terminal energy systems. While projects are moving from initial deployment to wider operational use, progress remains uneven across ports and equipment categories. Grid capacity, utility connection timelines, infrastructure costs, equipment availability and operational requirements continue to influence project delivery and investment decisions. Recent investments highlight the pace of deployment and the infrastructure requirements involved. In June 2026, the Port of Long Beach approved $58.2 million for 61 zero-emission cargo-handling machines and 21 charging systems. At the Port of New York and New Jersey, APM Terminals Elizabeth ordered 34 electric rubber-tired gantry cranes in August 2026, with deliveries scheduled through the end of 2028.
Federal policy, regulatory developments and funding programs remain important factors in port electrification planning. Federal clean vehicle tax credits ended for vehicles acquired after September 30, 2025, while the alternative fuel vehicle refueling property credit ended for eligible property placed in service after June 30, 2026. Meanwhile, the Environmental Protection Agency’s nearly $3 billion Clean Ports Program continues through existing project awards. For fiscal year 2026, the Maritime Administration made approximately $498 million available through its Port Infrastructure Development Program.
International attention on maritime electrification has also grown. At COP31 in Antalya in November 2026, the Environmental Defense Fund (EDF) and RMI (formerly Rocky Mountain Institute) launched the Maritime Electrification Breakthrough Goal in support of the COP31 Presidency’s voluntary “35 by 35” ambition. More than 30 maritime organizations have so far supported the initiative, including the Port of Long Beach. The goal calls for electricity to meet at least 20% of shipping’s final energy demand by 2035, primarily through shore power, battery-electric vessels and electrified cargo-handling equipment. For US ports, the initiative provides an international reference point for electrification priorities, particularly the coordination of vessel and terminal requirements with port infrastructure, grid capacity and investment planning.
Grid capacity and terminal electrical infrastructure are key factors in advancing port electrification. The Los Angeles Department of Water and Power (LADWP) is planning new underground distribution circuits to support additional demand at the Port of Los Angeles. Ports also face regulatory developments, equipment procurement considerations, charging requirements and the integration of battery energy storage, microgrids and energy management systems.
In the context of these developments, Global Transmission Report will convene the 5th Annual Port Electrification US conference on June 16–17, 2027, in Long Beach, bringing together port authorities, terminal operators, utilities, regulators, equipment manufacturers and infrastructure providers to examine project delivery, investment priorities and operational performance. The conference will assess progress on port electrification, examine barriers to implementation and identify solutions for infrastructure planning, technology deployment and investment.