Background and Mission

Electricity demand at UK ports is projected to rise substantially as shore power, electric cargo-handling equipment, vessel charging and heavy goods vehicle charging are deployed. Existing grid connections at most port sites cannot meet this projected demand. Connection costs and lead times constrain both the scale and the timing of investment.

The Department for Transport’s Net Zero Ports evidence review, published in August 2026, provides the most detailed published figures to date. Port companies projected future requirements of two to ten times current capacity, averaging around 91 megawatts (MW). Connection lead times of up to 15 years were reported.

Grid access is only one part of the investment decision. Shore power requires compatible vessels, suitable berth infrastructure and commercial arrangements that make electricity use viable for ports and ship operators. Electrifying cranes, terminal tractors and other cargo-handling equipment requires investment in machinery, charging systems and site infrastructure. Battery storage and on-site generation offer additional options for managing electricity demand, subject to local network conditions, capital costs and operating requirements.

Recent UK projects provide evidence on these infrastructure and commercial issues. Portsmouth International Port’s multi-berth shore power system entered operation in 2026, providing a case study in berth infrastructure, vessel compatibility and the cost of supplying electricity to ships. The Electric Thames project, led by UK Power Networks, assessed the energy requirements of 62 commercial vessels operating on the River Thames and identified 21 riverside sites with potential for charging infrastructure. The study provides a basis for assessing river-vessel charging requirements and potential locations; it does not represent a completed charging network.

Regulation and public funding also affect investment decisions. From 1 July 2026, the UK Emissions Trading Scheme (UK ETS) began covering emissions from domestic voyages and from activity in UK ports by ships of 5,000 gross tonnage and above. Offshore vessels are included from 1 January 2027. The revised National Policy Statement for Ports took effect in October 2026, updating the planning framework for relevant port development decisions in England and Wales. The government is also considering further measures to reduce maritime emissions, including emissions at berth. The UK Shipping Office for Reducing Emissions (UK SHORE) funds maritime decarbonisation projects, although grant support does not remove the wider financing requirements for grid reinforcement and commercial infrastructure.

Port authorities and terminal operators must therefore assess future electricity demand, secure connections, prioritise investments and determine how costs should be allocated between infrastructure owners and users. The requirements vary across container terminals, ferry ports, smaller coastal facilities, inland freight terminals and river ports.

In the context of these developments, Global Transmission Report is organising the 2nd annual Port Electrification UK conference on 18 May 2027 in London. The conference will focus on the decisions that determine the pace and cost of port electrification: securing grid capacity, selecting the right infrastructure, establishing viable commercial arrangements and allocating investment risk. 

It will bring together port authorities, terminal operators, shipping lines, electricity network companies, technology providers, investors and policymakers to examine the infrastructure, financing and operational requirements of port electrification across the country. It will cover major seaports, smaller coastal ports, inland freight terminals and Thames river terminals. 

The programme features six themes:

  • Policy, regulation and funding: maritime carbon pricing, port planning policy  and the scope and limitations of public funding.
  • Grid capacity and electricity supply: demand forecasts, connection availability, reinforcement costs, lead times and coordination with network operators.
  • Shore power and vessel charging: berth infrastructure, vessel compatibility, technical standards, utilisation, tariffs and commercial agreements.
  • Cargo-handling equipment: equipment selection, charging requirements, operational constraints, maintenance and whole-life costs.
  • Port energy systems: electricity networks, battery storage, on-site generation, electricity procurement and demand management.
  • Project delivery: procurement, contracts, risk allocation, commissioning and lessons from UK projects. 

HIGHLIGHTS FROM PORT ELECTRIFICATION EUROPE EDITION

DAYS TO GO

See you in 175 days 17 hours 1 minute
  • 175
    Days
  • 17
    Hours
  • 1
    Minutes
  • 23
    Seconds

 

 

When


18 May
2027

London


 

 

Planner Details