Background

Airports consume substantial amounts of electricity and operate large vehicle and equipment fleets across airside and landside operations. In the Western United States, state emissions requirements, constraints on grid capacity, and wildfire-related power disruptions affect the cost and pace of electrification. In Southern California, preparations for the LA28 Olympic and Paralympic Games in July 2028 add a near-term infrastructure priority. Airport operators, airlines, and ground handlers must secure adequate electrical capacity, plan fleet replacement, and finance charging infrastructure while maintaining daily operations.

California regulations establish specific electrification requirements for airport ground transportation. The California Air Resources Board (CARB) requires fixed-route shuttle fleets serving 13 regulated California airports to be 33% zero-emission by the end of 2027, 66% by the end of 2031, and 100% by the end of 2035. Separately, Los Angeles International Airport (LAX) has adopted a phased policy requiring all ground support equipment (GSE) to be zero-emission by 2033. CARB is also developing a Statewide Clean Aviation Initiative covering GSE, aircraft auxiliary power units, and aircraft taxiing. 

The expiration of key federal tax incentives increases the importance of alternative financing arrangements for airport electrification projects. The federal Section 30C alternative fuel vehicle refueling property tax credit does not apply to eligible property placed in service after June 30, 2026. Federal funding remains available through programs such as the Federal Aviation Administration's (FAA) Voluntary Airport Low Emission (VALE) program. In August 2026, Ontario International Airport received approximately $4.15 million in VALE funding for electric GSE charging infrastructure. 

Grid capacity and utility connection timelines are major determinants of electrification schedules. A 2026 study modeling more than 300 US airports estimated that peak electrical demand associated with GSE electrification could reach 20 MW at the largest airports. California has also established utility energization timelines and reporting procedures under Senate Bill 410 and Assembly Bill 50. These measures are relevant to airport projects requiring new or expanded electrical service. Emerging advanced air mobility operations present an additional infrastructure consideration. In 2026, the US Department of Transportation selected pilot projects, including initiatives led by Utah and Albuquerque, to test electric vertical takeoff and landing (eVTOL) aircraft and related technologies. 

Investment decisions over the next three years will have long-term consequences for airport operating costs, emissions and energy resilience. Progress will depend on coordination among airports, airlines, ground handlers, utilities, regulators and equipment suppliers, whose investment cycles and project timelines often differ. Grid upgrades can take longer than vehicle procurement and fleet replacement, so planning infrastructure ahead of equipment orders reduces the risk of delay. Load management, energy storage, and on-site generation may also help address capacity constraints, subject to site-specific technical and economic assessments.

Mission

The 4th annual Airport Electrification West conference, taking place on June 15, 2027, in Los Angeles, will bring together airport authorities, airlines, ground handlers, utilities, regulators, technology providers and investors to examine the key requirements for electrification across the Western States. 

The program will include topics such as grid connections, electric GSE, charging infrastructure, gate power, landside vehicle fleets, terminal energy systems and storage, and electric aircraft infrastructure, as well as relevant regulatory developments and financing mechanisms. The conference will also present case studies and technical discussions to examine project delivery, infrastructure planning, technology selection and financing, with a focus on the priorities facing airport operators and their partners.

HIGHLIGHTS FROM 2025 EDITION

DAYS TO GO

See you in 199 days 23 hours 12 minutes
  • 199
    Days
  • 23
    Hours
  • 12
    Minutes
  • 44
    Seconds

When

June 15, 2027

Los Angeles

Planner Details