Core Fundamentals
Installation Essentials
Start‑Up Procedures (The Heart of the Class)
· Pre‑start inspection
Power checks, wiring verification, refrigerant line inspection, filter condition, belt tension.
· Electrical start‑up
Phase rotation, voltage/amp checks, verifying control logic.
· Refrigeration start‑up
Charging procedures, verifying superheat/subcooling, checking for restrictions.
· Airflow verification
Fan speed adjustments, static pressure measurement, CFM confirmation.
· Economizer setup
Calibration, damper operation, sensor verification, integration with BAS.
· Gas heat start‑up
Combustion analysis, manifold pressure, safety checks.
Testing, Commissioning & Documentation
· Functional testing
Cooling, heating, economizer, safeties, alarms.
· Commissioning reports
What to record, how to document readings, how to communicate issues.
· Warranty and manufacturer requirements
What must be documented to avoid voiding coverage.